Project | Sprayable Microcement in The Empire State Building

A full apparel showroom floor in New York’s most recognizable building, finished in Arapido sprayable microcement and part of a 100,000 square foot fit-out certified LEED Gold.

The floor plate is almost entirely curved. A cove-lit wall runs the length of the corridor, rounded columns cut into it, and glass showroom fronts open off it one after another. A conventional floor needs a transition detail at every doorway and a trim at every turn. This one has neither. Arapido was sprayed over the existing slab, sealed, and carried through from reception to the corridors and into each showroom unit without a break.

Arapido suited this project for two reasons. Spray application is what makes a seamless floor achievable at this scale, since hand-troweling an area this size leaves tool marks and light washing down from a cove finds every one. And the system carries very low VOCs, which matters on a LEED Gold fit-out in a building that holds its works to stringent sustainability standards.